| Enbridge |
The Enbridge East Texas Expansion project required the installation of just over 100 miles of natural gas pipeline. This pipeline expansion project covered slightly more then 100 miles of land from Bethel Texas to Carthage, Texas, using one spread. ARB installed 107 miles of 36-inch natural gas pipeline and completed two horizontal directional drills under the Neches River and under Catfish Creek.