| Walnut Energy Center |
Turlock, California
Project: 250 MW Combined Cycle Power Plant
Owner: Turlock Irrigation District
CM: Calpine
Engineer: Utility Engineers
ARB's scope of work included the construction of mechanical piping, HRSG erection, and balance of plant. The project features two General Electric 7EA combustion turbines, and two each Nooter/Eriksen HRSG's.
During the execution of this project, ARB experienced zero weld rejects on the HRSGs and the BOP piping performed over 800 welds with only 3 rejects.